Dimensionierung von Entkopplungspuffern in dynamischen Fertigungsprozessen mittels Warteschlangen
DOI:
https://doi.org/10.2195/LJ_Not_Ref_Meinhardt_042007Keywords:
Intralogistics, Intralogistik, Logistics, Logistik, Material flow, Materialfluss, Materialflussplanung, intra logistics, technische LogistikAbstract
Due to a random, because not exactly foreseeable arriving of production orders and basic materials (delivery of supplier, retrieval from a storage area) on a first production area and a not constant transmission delay it comes to an irregular delivery of the finished orders at the second production area following. To achieve a high extent of utilisation there, nevertheless, a continuous treatment with constant supply is aimed. The solution is an intermediate buffer, which decouples the two processes. In this article a method is introduced which determines the distribution of the buffer occupancy on an analytical way and allows an estimation of the required size of the decoupling buffer with a predefined statistical safety.Downloads
Published
2007-04-03
How to Cite
Sunarjo, F., Meinhardt, I., & Marquardt, H.-G. (2007). Dimensionierung von Entkopplungspuffern in dynamischen Fertigungsprozessen mittels Warteschlangen. Logistics Journal: Editorial-Reviewed. https://doi.org/10.2195/LJ_Not_Ref_Meinhardt_042007
Issue
Section
Artikel